Angola: Construction of Mini-Hydroelectric Dam of Gangelas Scheduled to End Soon

[ANGOP]Chibia -The construction works of the Gangelas mini-hydroelectric dam, located in Chibia Municipality, southern Huila Province, an undertaking which will have the capacity to produce 1.8 megawatts of power, are scheduled to end within thirty days, as announced last Friday by the technical director of the Managing Society of the Gangelas Irrigated Perimeter, Josefa da Silva.