Zungeru Hydro - Construction At U.S.$1.8 Million Per Megawatt Is Cheap - Power Minister

NIGERIA

[Leadership]Construction of the 700mw Zungeru hydro power project will cost about $1.85 million per installed megawatt, compared with the global average costs of between $1.05 million and $7.65 million per megawatt.