Western Cape Transport and Public Works On R60 Crater Repair Progress

[SA Govt]The crater on the R60 between Ashton and Swellendam created after a slip failure in November 2012 will be fully repaired by the end of March 2013. The bulk excavation of the crater has been completed and 38 100 cubic metres of material was removed. The rock fill at the toe of the crater is 60% complete.